close
Friday May 03, 2024

Recent rains turn potholes at Kak Bridge into deep ditches

By APP
May 18, 2020

Islamabad:The recent rains have turned the already neglected potholes at around six-kilometre stretch of the single Kahuta Road, from Kak Bridge to Swan Camp, into deep ponds and made the movement difficult for all types of vehicles.

The road is in a dilapidated condition where most of the vehicles are driven in zigzags to avoid pool-like potholes especially near the Kak Bridge, Sihala Police Station, Model Town Humak and the underpass connecting the Grand Trunk (GT) Road.

Residents of Model Town Humak and adjoining localities have demanded of the authorities concerned to immediately repair the artery, which has great strategic significance as it's one end touches the GT Road and the other Islamabad Expressway, linking Azad Jammu and Kashmir with other parts of the country.

On one side of the busy road is the Kahuta Industrial Triangle Zone and on the other is a residential area consisting of schools and colleges.

The frightening situation could be imagined when heavily loaded oil tankers and gigantic long vehicles ply on the single-road day and night for the transportation of factory goods in crisscross to avoid deep and wider potholes.

Last time, the Punjab government had reconstructed and widened the road-section by allocating special funds just before the General Election-2013, turning a blind eye towards its mandatory post-construction maintenance.

“The shaky movement of long and heavily loaded vehicles, carrying factory goods, on the bumpy single-road poses a great threat to commuters,” Ali Raza, a resident of Model Town, told this agency on Sunday.

“Often, the situation gets more worsened when long-vehicles, trucks, and oil tankers were parked in long queues along both sides of the broken road, usually half on road, to wait for their loading and offloading turn in the factories. This practice is going unchecked as there is no deployment of traffic police,” he said, adding the narrow passage due to the dangerous parking and the ramshackle road was a constant nuisance for the residents, which needed immediate attention of the authorities concerned. Muhammad Ali, another resident, said this section of the road had virtually turned into a parking lot of Kahuta Industrial Triangle due to the non-serious attitude and mismanagement of factories administration, especially non-deployment of traffic police personnel.

He said dozens of long vehicles, oil tankers and trucks could be witnessed stationing in queues along both sides of the single-main artery, adding the increasing trend of criminal parking can cause fatal accidents any time.

He said the matter had been brought into the notice of high-ups of Islamabad Traffic Police and we are waiting for the necessary action. The residents have appealed to the authorities concerned to carry out the repair work and make regular deployment of traffic police on an urgent basis to avoid any road tragedy.

CDA: Capital Development Authority (CDA) has invited bids from construction firms through advertisement in newspapers to initiate the process for construction of Malal Bridge at Lehtarar Road.

This will be second development project by the CDA on Lehtarar Road.

Construction of 700 meters dual road near PINSTEC is also part of the project.

Construction of Burma Bridge at Lehtarar Road is already in process.

Lehtarar Road was dualised in 2007 and 2008 however, two important bridges - Burma Bridge and Malal Bridge - were not constructed that time resulting in traffic congestion on road as regular feature causing problem for local population.

People of the area were demanding construction of both bridges for a long time.

Being sensitive to the situation, the CDA administration started construction work at Burma Bridge earlier this year and has now initiated process for construction of Malal Bridge. At its completion, the project will bring ease in the lives of local population.