Highway repairs

April 01, 2019

The Islamabad Highway from Gulberg Green Interchange to Rawat was in poor shape before the recent rains. After the rains many potholes and bumps have appeared. The potholes need filling and the bumps need to be grinded to make the road level again.

I would like to know if the CDA’s roads department has money in its budget for repairing this heavily travelled highway? If yes, why aren’t they repairing this portion of the Islamabad Highway?

Syed Hussein El-Edroos

Islamabad