LAHORE: Saggian Ravi Bridge on Wednesday remained closed for heavy traffic due to the patch work. The traffic coming from outside Lahore and exiting the city was plying two-way. CTO said the load of traffic would increase due to the one side closure of the bridge.
Meeting decides to commence consultations to adopt a joint national narrative against terrorism
“This strategy aims to strengthen overall public health capacity while achieving polio eradication”, said WHO...
However, day temperatures would rise due to high pressure in the upper atmosphere in most parts of the country
Clampdown against the people engaged in the overbilling and electricity theft, has surged on the directives from the...
This marks the second positive sample from District Pishin this year
193-member UNGA debates Russia’s veto in the Security Council last month which blocked a draft resolution aimed at...