GHAZI: Federal Minister for Power Omar Ayub Khan on Sunday said achieving the target set by Prime Minister Imran Khan, Rs13 billion savings had been made in 90 days, which was the proof of the exquisite performance of Pakistan Tehreek-e-Insaf (PTI)-led government.
Addressing a public gathering at Tarbela Ghazi, he said that electricity theft was controlled, line losses were reduced and dues recovery system was improved during these days. Omar Ayub inaugurated a project of gas supply to Jalu, Pihaye and Essa areas of Tarbela
Ghazi. Member of Provincial Assembly (MPA) Faisal Zaman, District Nazim Haripur Adil Islam, Tehsil Nazim Aslam Hayat, Javed Iqbal and others were present on the occasion. The minister said that gas pipelines distribution project, worth Rs50.6 million, was under progress in Ghazi and soon solar energy, hydel power and wind energy projects would be launched in the area.
Saad was of the view that the battle of politics should be fought solely through political means
KP govt decided to develop gemstone business as a formal export sector and cluster at the Namak Mandi would be...
Khyber Pakhtunkhwa Minister for Higher Education, Archives, and Libraries, Meena Khan Afridi. — APP FilePESHAWAR:...
Vehicles and horse carts passing through flood water at Bara Bazar area on Khuwani bridge after heavy rain in Peshawar...
Amid the failure to revive the cash-bleeding PIA, government is left with no other option but to sell it to any...
Picture showing the Silver Jubilee Gate of the University of Karachi. — APP File KARACHI: The University of Karachi...