KARACHI: Pakistan Cables, the nation’s pioneer wires and cables manufacturer, has completed the successful commissioning of its 2MW captive solar power plant located at its new manufacturing facility in Nooriabad, Sindh.
The project was executed by Atlas Energy Limited for Pakistan Cables within stipulated timelines and has commenced operations. The installed capacity of solar power plants is an investment in renewable energy initiatives by the Company. “We are committed to pursuing environmentally friendly initiatives in the future at our state-of-the-art manufacturing facility at Nooriabad, Sindh.
We actively advocate use of renewable energy sources that save cost and contribute to the circular economy”, said Fahd K. Chinoy, Chief Executive Officer – Pakistan Cables Ltd. Pakistan Cables is the first and only building material Company in Pakistan to have science-based emission reduction targets validated by SBTi. The Company’s new state of the art manufacturing facility spread across 42 acres of land in Pakistan, is equipped with cutting edge technology and equipment, set to transform the industry.
An aerial view of Karachi city. — AFP/FileSoliloquyArtChowk the Gallery is hosting an art exhibition featuring works...
Sindh Chief Minister Syed Murad Ali Shah speaks at an event in a local hotel on July 7, 20254. — Facebook/Sindh...
Activists of Tehreek-e-Insaf hold a protest demonstration for the release of PTI Founder Imran Khan, at the Karachi...
Karachi Metropolitan Corporation City Council opposition leader, Saifuddin Advocate speaks to local government...
A representational image showing a gas flame. — AFP/FileThe SSGC is commissioning yet another gas distribution...
This representational image shows a person holding a gavel. — Pexels/FileA sessions court has sentenced a man to...