approximate length=18.5 km (Package 3:Fish Market to Chungi No.14, length=1.171 km) (Revised) at a cost of Rs 2806.37 million, Construction of Multan Metro Project Corridor-I: BZU to Kumharan Chowk passing through the Major Intersections of Northern Bypass, Chungi No 6, Chungi No.9, Fish Market, Daulat Gate, Chungi No.14, BCG Chowk and Vehari Chowk, approximate length=18.5 km. (Package 4: Chungi No.14 to BCG Chowk and segment of Vehari Road, length=2.581 km) (Revised) at a cost of Rs 3410.41 million, Construction of Multan Metro Project Corridor-I: BZU to Kumharan Chowk passing through the Major Intersections of Northern Bypass, Chungi No 6, Chungi No.9, Fish Market, Daulat Gate, Chungi No.14, BCG Chowk and Vehari Chowk, Approximate length=18.5 km (Package 5: Vehari Road to Chowk Kumharan, length=5.464 km) (Revised) at a cost of Rs 3805.56 million, Construction of Multan Metro Project Corridor-1: BZU to Kumharan Chowk passing through the major intersections of Northern Bypass, Chungi No.6, Chungi No.9, Fish Market, Daulat Gate, Chungi No.14, BCG Chowk and Vehari Chowk, approximate length=18.5 km. (Package 6: BZU to Chowk Kumharan, length=18.52 km) at a cost of Rs. 4238.70 million, Construction of Multan Metro Project, Supply, Installation, Testing, Commissioning, Operation & Maintenance of Escalator & Elevators (Revised) (Package-7) at a cost of Rs 1826.87 million, Construction of Multan Metro Project, Supply, Installation, Testing, Commissioning, operation & maintenance of Solar Street Lights Generators and Platform Screen Door (PSD) (Package-8) at a cost of Rs 1582.92 million, Construction of Multan Metro Project, Bus Depot & Command and Control Center (Package-9) at a cost of Rs 2195.000 million, Construction of Ring Road DG Khan (Remaining Portion) length=5.20 km, DG Khan (Revised) at the cost of Rs. 308.881 million, Widening / Improvement of Head Muhammad Wala to Karam Dad Qureshi Kot Addu Layyah Road via MM Road along T.P Link Canal length 47.10 km, Muzaffargarh (Revised) at a cost of Rs 949.820 million, Construction of bridge over River Indus near Miran Pur on linking N-55 at Arbi Tibba with RY Khan (length:4335 Rft), RY Khan at a cost of Rs 2463.218 million, Construction of Approach Road to Iccha Bangla (length:23.25 km), RY Khan at a cost of Rs 1327.785 million, Widening / Improvement of Arifwala-Hota Road, length=20.00 km in District Pakpattan (Revised) at a cost of Rs 224.826 million, Widening / Improvement of Okanwala Road (57/12-L Pull) to Chowk Muttan Wala via Chak 65/12 L, length=26.10 km, District Sahiwal (Revised) at a cost of Rs 270.516 million, Widening / Improvement of road from Ilahi Bakhsh Chowk (46/12 L) to 59/12l via Pull 50-More and 56-A/12 L Madhial, length=22.70 km, District Sahiwal (Revised) at a cost of Rs 209.482 million, Up-Gradation of Un-Manned & Manned Level Crossings in the Interest of Public Safety (Punjab Province) at a cost of Rs 634.686 million, Widening / Improvement of road from Kahna Katcha road to Halloki Railway Crossing (part a) in District Lahore at a cost of Rs 143.510 million, Dualization of road Jandiala Sher Khan, Hiran Minaar, Minor Road to Chichoki Mallian via Allama Mashariki Park along Railway Line length 11.15 km, District Sheikhupura at a cost of Rs 471.540 million, Construction of Dual Carriageway (Widening & Improvement) of road from Kingra to Sialkot length=31.50 km (Stretch from km No. 0.00 to 10.10 length=10.10 km) District Sialkot at a cost of Rs. 296.043 million, Construction of road from Mainwal Ranjha to Saida via Qadirabad length=17.00 kms, District MB Din at a cost of Rs 229.123 million, Construction of road from Kotli Sattian to Dhanda length=15.61 km Tehsil Kotli Sattian District Rawalpindi (Revised) at a cost of Rs. 233.416 million, Widening / Improvement of Chakri Adda Harnianwala via Bilawal Road i/c Bridge over Sill River length=20 km, Rawalpindi (Revised) at a cost of Rs 562.060 million and Verification of Prioritized / Screened Road with reference to Viability / Necessity under Khadim-e-Punjab Roads Programme (PC-II) at a cost of Rs 30.800 million.