KP CM opens work on dam, canal extension in Swabi
SWABI: Khyber Pakhtunkhwa Chief Minister Mahmood Khan and National Assembly Speaker Asad Qaiser inaugurated the construction work on Utla Dam and extension of Pehur High Level Canal (PHLC) here on Saturday.
The two huge projects would cost about Rs12 billion.
KP Governor Shah Farman, provincial Information Minister Shaukat Yousafzai, Advisor to Chief Minister on Industry Abdul Karim, MPAs Rangaiz Khan and Aqibullah Khan and other PTI leaders were also present on the occasion.
Utla Dam is a drinking water project for various areas in Gadoon Amazai and extension of PHLC is an irrigation scheme.
Addressing the inaugural ceremony, the chief minister said that the Pakistan Tehreek-e-Insaf (PTI) leadership had fulfilled a pledge made during the election campaign.
The dam would provide potable water to the people, he added.
Mahmood Khan said that Gadoon Amazai would be developed on a fast-track basis. The chief minister added that a modern hospital and two higher secondary schools for girls would also be built there.
He said that prevailing difficult economic situation would be improved. He alleged that former rulers were responsible for the prevailing economic mess.
"Majority of former rules are now behind bars due to their involvement in corrupt practices," he said.
Asad Qaiser, who won election from this constituency, said that with the completion of the dam, the people of Utla and its surrounding villages would no longer face drinking water problem.
Asad Qaiser said that PTI had completed record number of uplift projects in its previous term.
He said many uplift projects had been initiated in Gadoon Amazai to facilitate the people and solve their problems.
The speaker added said that he had honoured the promise made with the people of the area. "We are determined to work for the wellbeing of the people," he maintained.
Meanwhile, officials said the water project would be completed at an estimated cost of Rs10,156 million having future provision, in the 29 km long pressure pipeline, for irrigating additional 10,930 acres of barren land. The project is scheduled to be completed by the year 2022.
-
Winona Ryder Lands Secret Role In 'Wednesday' Season Three, Marking Reunion With Tim Burton -
Andrew, Fergie’s Life Without The Bells And Whistles Turns Grimmer: ‘A Lot More Was Happening’ -
Nicole Kidman And Keith Urban's Divorce Drama Deepens As Teen Daughters 'stick' By Their Mother's Side -
William, Kate Desperate To Make Public Statement Distancing Themselves From Andrew -
Charli Xcx Details Boozy Second Wedding To The 1975's George Daniel: 'Everyone Was Hungover' -
Gracie Abrams Follows 'Kylie Jenner Playbook' With Paul Mescal Romance -
Dua Lipa Shares 'Love Letter' With New Boyfriend After Emily Ratajkowski Confirms Romance With Her Previous Beau -
Brazilian Beauty Influencer Passes Away After Suffering 'medical Emergency' -
Sarah Ferguson Turns Into A Bulldozer With Beatrice, Eugenie: ‘Help Me Out’ -
Australian Prime Minister's Letter Against Andrew Mountbatten-Windsor Made Public -
'Project Runway' Alum Tim Gunn Reveals Why He's Been Celibate For 43 Years -
Delroy Lindo Breaks Silence On John Davidson's Racial Slur Shock At 2026 BAFTA: 'We Did What We Had To Do' -
King Charles Prepares Next Move As Andrew Shows No Remorse -
Epstein's Brother Invited To Discuss Royal Family's Future After Andrew's Arrest, On Popular Show -
BAFTA Winner Robert Aramayo Defends Director's Racial Slurs Amid Tics -
Prince William, Kate Middleton’s Troubles Take On A New Face: ‘They’re Steeling Themselves’