About Gwadar
By our correspondents
June 23, 2016
Gwadar was once part of Oman. Pakistan took over Gwadar in 1958 by paying off $3 million. In 2009, the government of Pakistan made Gwadar Port fully operational.
The port has the potential to cover half of the waterway trade through the world because of its exceptional location connecting the oil Gulf with the West by cutting the distance to half, which makes it a very beneficial option for all oil trading countries.
Ansa Javiad
Faisalabad
-
Nicola Peltz's Ex's Sister Reveals 'truth' About Actress Amid Brooklyn Beckham Drama -
Davos: Elon Musk’s Surprise Addition To The Schedule Draws Global Attention -
Why Kylie Jenner's Family Loves Timothée Chalamet -
World's Oldest Artwork: 68,000 Year-old Cave Paintings Discovered In Indonesia -
Brooklyn Beckham’s Family Feud Shows No Signs Of Healing Anytime Soon -
Spain Calls For EU Joint Army After Trump’s Declaration Of Greenland Deal -
Elon Musk Pokes Fun At Anthropic, Calls It 'misanthropic' -
Gwyneth Paltrow Opens Up About Coping With ‘anxiety’ -
New Study Links ‘binge-watching Addiction’ To Increased Social Isolation -
Jason Statham Reflects On Intenses Physical Demands Of Work -
Why Cancer Comes Back And How Scientists Believe It Can Be Stopped -
US To Exit WHO: A Seismic Shift In Global Health? -
Palace Staff Reveals Nothing Has Changed For ‘disgraced’ Andrew After Losing Titles -
How Did Taylor Swift Cope With ‘exhausting’ Sickness During Popular ‘Eras Tour’ -
Artists Launch ‘Stealing Isn’t Innovation’ Campaign Against AI Use -
Elon Musk’s XAI Grok Imagine Now Generates 10-second Videos With Sharper Quality: Here’s How