ISLAMABAD: National Electric Power Regulatory Authority (NEPRA) has taken a serious notice on unscheduled load shedding which has been carried out in various areas of K-Electric during the last three days.
According to a press release issued here Friday, CEO (K-Electric) has been directed to immediately submit a detailed report about significant increase in load shedding in K-Electric's jurisdiction.
It is added that, on the matter of un-scheduled load shedding, NEPRA had already given directives to K-Electric, to rectify the prevailing situation, furthermore, report had also been sought by NEPRA previously from K-Electric on the load shedding issue