The refurbishment of the legendary Dubai Fountain entailed improved illumination and enhanced sound systems.
Dubai Fountains’ renovation will be completed till October 1, 2025, following a five-month shutdown for significant technical enhancements.
Emaar has announced the official schedule for reopening and significant upgrades offering a visual feast.
As has been noticed, the famous locations found at the base are the main attractions.
In the meantime, the tourist attraction site, situated at the bottom of the Burj Khalifa, was shut down due to a technical hitch and system upgrade.
The refurbishment provides a modernized form of the fountain's mechanical, lighting, and sound systems.
The new equipment was installed to enable smoother water choreography and variable lighting effects.
This piece of work was intended to complement the entire dynamic fusion of light, water, and music.
The digital installations were installed on the adjacent harborfront path during the closure.
A temporary closure was declared in February, and the company vowed that the fountain would be even more hypnotizing.
It is time to get excited, and tourists should anticipate enjoying the breathtaking, choreographed fountain, as well as an even greater spectacle and a more eye-catching show.